Weekly Review #2 + Update

During the second week in Coober Pedy was focused on preparations for the BWSC.

First, the team trained in a pre-scrutineering for the technical acceptance test, which is a BWSC regulation and a requirement for participating in the challenge. In this test, the basic features of the car, such as adjusting the solar arrays, and the light are presented and checked.
 

Secondly the blue.cruiser went on it’s first prerun. In a prerun a certain stage of the race is simulated under race conditions – which means starting at 8 am and stopping at checkpoints. Check it out here:




Update

Unfortunately, a major problem has been discovered at the rear chassis in further consequence of the previous prerun. Driving, or transporting the thyssenkrupp blue.cruiser in a trailer is, at the moment, impossible. The repairs force us to stay longer than planned in Coober Pedy, but as soon as the repairs are completed, we are going to depart to Darwin. The whole team is working on a solution, and feels certain about going back on the road soon.

More News

SESC Tag 1 – Ankunft im Land der Pyramiden

uf eine lange Nacht im Flugzeug folgt ein spannender und aufregender erster Tag. Nachdem die erste Hälfte des Teams schon ein paar Tage in Kairo verbracht hat, sind nun auch wir –...
[ Read more ]

SESC – Die Sonne ist das Ziel

Mit dem Allstar Team schickt die Hochschule Bochum acht erfahrene SolarCar Mitglieder zur zweiten United Solar Challenge, der Somabay Egyptian Solar Challenge (SESC), die vom 17....
[ Read more ]

Our partners